Raymond Mill for Petroleum Coke Powder Making

chat online inquiry pdf
  • Details
  • Parameters
  • Case
  • Maintenance
  • Inquiry

Raymond Mill for Petroleum Coke Powder Making

image.png


Specializing in the field of petroleum coke powder making, Guilin Hongcheng has created a new type of Raymond Mill, namely the HC Vertical Pendulum Grinding Mill through the technology upgrades and innovations. Compared with the traditional Raymond Mill, this kind of equipment covers a number of technology patents, and the performance of the entire equipment has been greatly improved.

As ideal equipment for powder making, the application value of Raymond Mill is relatively high. Combined with the usage and market value of petroleum coke, this new type of Raymond Mill not only improves the powder-making efficiency of petroleum coke, but also reduces energy consumption. Hence, it is desirable equipment for enhancing the market value of petroleum coke and expanding application field of petroleum coke.

It is believed that with the further development of the petroleum coke market, the application of Raymond Mill will be more popular.

 


QQ图片20191107152735.png

The daily inspection items of the milling machine:

1. Regularly listening to the normal operation sound of the mill and the classifier, and whether there is any abnormal sound.

2. Checking if the reducer and other equipment has any oil leakage, water leakage or material leakage?

3. Checking the wear of the tie rod seal every month.

4. Regularly check the function of the scraper and returning system.

5. Checking the pumping station every day, including: oil level of the fuel tank and refueling if necessary. The oil should be in accordance with the specified oil; check the pressure of each pressure gauge; check whether the filters are blocked.

6. Checking the oil return condition of the grinding roller lubrication station and whether the oil filling pressure is normal.

7. Always check the oil pipes and valves for oil leakage.

8. Measuring the wear of the grinding disc and the grinding roller liner each 1000H, and make a record.

9. Checking the pressure of the accumulator once a week.

10. Regularly check the center frame, nozzle ring, air guiding vane, water spray pipe and other grinding accessories.

 

 

Grinding Mill maintenance:

1. There should be a fixed person responsible for operation in using process, the operator must equipped with professional technical knowledge. Before the installation, the operator must carry out the necessary technical training to understand the principle performance of the mill and familiar with the operating procedures.

2. In order to keep the mill in good condition, the "safe operation system for equipment maintenance" should be established, and necessary maintenance tools as well as grease and corresponding accessories should be provided.

 

3. After using the grinding machine for a period of time, it should be repaired and maintained. Meanwhile, the wearing parts such as grinding rolls, grinding rings and blades should be repaired and replaced. The grinding roller device should be carefully check the connection bolt nut before use and after, see if there is looseness, whether the grease is sufficient. The refueling tools are available with manual refueling pumps and grease guns.

 

4. The grinding roller device of the mill needs to be replaced after using for more than 500 hours. When the grinding rolls are replaced, the rolling bearings in the sleeve must be cleaned.

 

5. According to the size of the material, soft and hard, water content, specific gravity, the processing thickness is also different. The analyzer of the mill, high speed, high fineness, low speed and low fineness can be adjusted. Increase the fineness and the output will be reduced accordingly. If the requirements are not met, the fan speed should be debugged and the user can flexibly master it.

 

6. The scrapping limit of the grinding roller ring of the mill, the remaining minimum wall thickness shall not be less than 10mm.

 

7. The feed should be stopped when the mill stops, and the main machine continues to grind. The motor of the main unit and the motor of the analyzer can be turned off to stop the grinding work after about one minute. After that, the blower motor is stopped to purge the remaining powder.